222 clarence Street
Project Location: 222 Clarence street Sydney
Project Cost: 8mil
Completion Date: 2019
Project timing: 18 months
Project Manager: April Group
Engineers: Evolved Engineers
Builder: SMP
Photography: Terrance Chin All rights reserved. © 2020
The eight level internal and exterior refurbishment was designed to reimagine all levels of the heritage listed Clarence Street building. It required careful management of the works to minimise disruption to existing tenancies operating throughout the building. The project has been transformational , turning the traditional floor-plan into a flexible open apartment like working environment that embraces open-plan workplace design.